SHIFT SIDE MID-CONTROL
941001232021-04-01
GENERAL INFORMATION
Table 1. General Information
Kits
Suggested Tools
Skill Level(1)
Time
50502090
Safety Glasses, Torque Wrench, E-CLIP TOOL (Part Number:HD-52369), LOCTITE 243 (BLUE) (99642-97)
1 hour
(1) Tightening to torque value or other moderate tools and techniques required
KIT CONTENTS
Figure 1. Kit Contents: Shift Side Mid-Control
Table 2. Kit Contents: Shift Side Mid-Control
Verify that all contents are present in the kit before installing or removing items from vehicle.
Item
Qty
Description
Part No.
Notes
1
1
Foot shift lever
33600233
2
2
Screw
4387
3
1
Screw, pinch
856A
4
1
Spacer
7078
5
1
Shifter rod
33600125
6
1
Front shifter rod lever
33600143
7
1
Lever shaft
33900199A
8
1
Screw
2932A
9
1
Washer
6702
10
1
Nut
7748W
11
1
Foot support bracket
50500603
12
2
Screw, foot support bracket
10200536
13
1
Plug
10040
14
1
Shifter peg
33600156
15
1
Screw
34591-08
GENERAL
Models
For model fitment information, see the Parts and Accessories (P&A) Retail Catalog or the Parts and Accessories section of www.harley-davidson.com.
Verify that the most current version of the instruction sheet is used. It is available at: h-d.com/isheets
Contact Harley-Davidson Customer Support Center at 1-800-258-2464 (U.S. only) or 1-414-343-4056.
Installation Requirements
    These part are available at a Harley Davidson dealership:
  • Separate purchase of Outer Primary Cover (25700937) or (25700941).
  • Separate purchase of Inner Primary Cover (36500105).
  • Separate purchase of Gasket Kit (25701079).
  • Separate purchase of Gasket (63869-06).
  • Separate purchase of Bushing (34982-02A).
WARNING
Rider and passenger safety depend upon the correct installation of this kit. Use the appropriate service manual procedures. If the procedure is not within your capabilities or you do not have the correct tools, have a Harley-Davidson dealer perform the installation. Improper installation of this kit could result in death or serious injury. (00333b)
NOTE
This instruction sheet references service manual information. A service manual for the year and model motorcycle is required for this installation and is available from:
PREPARE
1. Set vehicle upright. See service manual.
REMOVE
1. Figure 3 Remove footpeg.
a. Remove E-clip (2) using special tool.

Special Tool: E-CLIP TOOL (HD-52369)

b. Remove clevis pin (5).
c. Remove footpeg (3).
d. Remove torsion spring (4).
2. Disconnect shifter connecting rod from transmission gear shift lever.
3. Figure 2 Remove foot support bracket.
a. Remove screws (2).
b. Remove foot support bracket (1).
4. Remove outer and inner primary covers. See service manual.
1Foot support bracket
2Screw (2)
Figure 2. Left Foot Support Bracket (Typical)
1O-ring (2)
2E-clip
3Footpeg
4Torsion spring
5Clevis Pin
6Foot support bracket
7Wear Peg
Figure 3. Left Side Footpeg (Typical)
INSTALL
Front Shifter Rod Lever
1. Figure 4 Install front shifter rod lever (1) onto lever shaft (10).
2. Install pinch screw (11). Tighten.
Torque: 24.4–29.8 N·m (216–264 in-lbs) Front shifter rod lever pinch screw
3. Install bushing (34982-02A) in new inner primary with hole. See service manual.
4. Install front shifter rod lever (7) with shaft (10) through new inner primary cover.
5. Install inner primary cover with new gasket. See service manual.
6. Assemble primary drive components. See service manual.
7. Install new outer primary cover with hole and new gaskets. See service manual.
Shifter Rod
1. Figure 4 Install shifter rod.
a. Install shifter rod (3) to each shifter rod lever (1, 2).
b. Install screws (4). Tighten.
Torque: 13.6–19 N·m (120–168 in-lbs)
Foot Support Bracket
1. Figure 5 Install foot support bracket.
a. Install foot support bracket (1).
b. Install screws (2). Tighten.
Torque: 54–61 N·m (40–45 ft-lbs)
2. Install plug into empty hole in vehicle frame.
3.
NOTE
When installing E-clip, use E-clip tool to help prevent damage to painted surfaces.
Figure 3 Install footpeg removed earlier.
a. Insert short leg of torsion spring (4) into hole in footpeg (3).
b. Insert long leg of torsion spring (4) into hole in foot support bracket (6).
c. Rotate footpeg into position.
d. Install clevis pin (5).
e. Install E-clip (2).

Special Tool: E-CLIP TOOL (HD-52369)

Foot Shift Lever
NOTE
Foot shift lever peg height is a customer preference. During installation, check operation of shift lever. To achieve proper gear engagement and to avoid damage to transmission, the peg must not contact foortboard or supports when shifting.
1. Figure 1 Install shifter peg (14) and screw (15) to foot shift lever (1). Tighten.
Torque: 10.8–16.2 N·m (8–12 ft-lbs)
2. Figure 4 Install spacer (8) onto lever shaft (10).
3. Figure 4 Install foot shift lever.
a. Install foot shift lever (7) onto lever shaft (10).
b. Position shifter peg at preferred height.
c. Install pinch screw (5), washer (6) and nut (9).
d. Tighten.
Torque: 32.5–38 N·m (24–28 ft-lbs) Foot shift lever pinch screw
4.
NOTE
  • Shifter rod should not require adjustment under normal circumstances. However, if full gear engagement or full lever travel is not achieved, adjust shifter rod.
  • Do not allow shift lever to contact support bracket when shifting. This prevents proper gear engagement. Contact may also damage the transmission.
Figure 4 Adjust shifter rod.
a. Disconnect forward end of shifter rod from forward shifter rod lever.
b. Loosen jamnuts.
c. Adjust shifter rod (3) as necessary.
d. Secure shifter rod (3) to front shifter rod lever (1). Tighten.
Torque: 13.6–19 N·m (120–168 in-lbs)
e. Tighten jamnuts.
Torque: 9.5–14.9 N·m (84–132 in-lbs)
1Shifter rod lever, front
2Shifter rod lever, rear
3Shifter rod
4Screw (2)
5Pinch screw
6Washer
7Foot shift lever
8Spacer
9Nut
10Lever shaft
11Pinch screw
Figure 4. Shift Linkage
1Foot support bracket
2Screw (2)
Figure 5. Mid Controls