Accessory Footboard Inserts
J026612019-08-21
Table 1. General Information
Kits
Suggested Tools
Skill Level(1)
Time
50295-02, 50310-02, 50500093, 50500096, 50549-08, 50627-08, 51011-01, 51017-01, 54187-10, 54196-10, 50501397
Safety Glasses, Pliers, Dish soap
1 hour
(1) Only simple tools and techniques required
KIT CONTENTS
Figure 1. Kit Contents: Footboard Insert Components (Left side shown)
Table 2. Kit Contents: Footboard Insert Components
Item
Qty
Description
Part No.
Notes
1
2
Footboard, passenger
Not sold separately
NOTE
Verify all contents are present in the kit before installing or removing items from vehicle.
GENERAL
Models
For model fitment information, please see the P&A Retail Catalog or the Parts and Accessories section of www.harley-davidson.com (English only).
Ensure you are using the most current version of the instruction sheet which is available at: www.harley-davidson.com/isheets
Contact Harley-Davidson Customer Support Center at 1-800-258-2464 (U.S. only) or 1-414-343-4056.
Installation Requirements
This kit contains two foot board inserts.
There are no service parts available with this kit.
NOTE
Black Footboard inserts 50549-08 and 50627-08 are designed to show signs of wear. Over time the paint will wear off giving a distressed look.
WARNING
Rider and passenger safety depend upon the correct installation of this kit. If the procedure is not within your capabilities or you do not have the correct tools, have a Harley-Davidson dealer perform the installation. Improper installation of this kit could result in death or serious injury. (00308b)
REMOVE
1. Remove existing footboard inserts.
a. Apply liquid dishwashing soap to footboard insert rubber beads protruding through bottom of footboard.
b. Pry footboard insert out from the top of footboard to remove insert.
INSTALL
NOTE
Medallion of Ride Free inserts should be toward rear of vehicle.
1. Install new footboard inserts.
a. Apply liquid dishwashing soap to new footboard insert rubber beads.
b. Place footboard insert into position on footboard.
c. Use pliers to pull each rubber bead into its footboard hole until beads protrude through footboard.
d. Repeat above steps for remaining footboard insert.