Kits | Suggested Tools | Skill Level(1) |
|---|---|---|
69203678 | Safety glasses, Torque wrench, Drill, Drill bits, Masking tape, Isopropyl alcohol |
Verify that all contents are present in the kit before installing or removing items from vehicle. | |||||
|---|---|---|---|---|---|
Item | Qty | Description | Part No. | Notes | |
1 | 1 | Light assembly | 67801551 | ||
2 | 1 | Wire harness, Tour-Pak | 69203948 | ||
3 | 4 | Cable strap | 10006 | ||
4 | 4 | Retainer, self adhesive | 69200342 | ||
5 | 5 | Screw | 10200147 | ||
6 | 4 | Clip | 57000779 | ||
7 | 2 | Grommet | 12100228 | ||
8 | 1 | Plug, connector | 69203512 | ||
9 | 1 | Connector, 6-pin | 72188-07BK | ||
10 | 1 | Wire harness, speaker, lighting, adapter | 69203683 | ||
11 | 2 | Seal plug (Not Shown) | 72473-07 | Used on three open cavities for Item 9 | |
12 | 1 | Cable strap, reusable (Not Shown) | Not sold separately | ||
| 1. | Remove seat. See service manual. | |
| 2. | Remove left saddlebag. See service manual. | |
| 3. | Remove left side cover. See service manual. | |
| 4. | Remove main fuse. See service manual. |
| 1. | If installed, remove Tour-Pak. Refer to Installation Requirements. | |||||||||
| 2. | See Figure 2. Remove lower tether anchor. a. Secure Tour-Pak top in open position. b. Remove two screws (1). c. Remove lower tether anchor (2) from Tour-Pak tub (3). d. Remove Tour-Pak tub liner (4). |
Figure 2. Lower Tether Anchor | ||||||||
| 3. | See Figure 3. Remove filler panel from Tour-Pak. a. Remove four screws (2). Save for later use. b. Remove and discard filler panel (1). |
Figure 3. Filler Panel | ||||||||
| 4. | See Figure 4. Remove ground plate (3) from Tour-Pak tub. a. Remove two screws (1) securing ground plate flanges. b. Remove four nuts on posts (2) securing rack to ground plate (3). |
Figure 4. Ground Plate |
| 1. | See Figure 5. Drill five 1/8-in pilot holes (1) for light assembly. | |||||
| 2. | Drill 1/8-in pilot hole (2) for back grommet. | |||||
| 3. | Drill five 1/4-in holes (1) for light assembly. | |||||
| 4. | Drill one 3/4-in hole (2) for back grommet. | |||||
| 5. | Deburr all holes. |
Figure 5. Drill Hole Locations | ||||
| 6. | See Figure 6. Make measurements to locate pilot hole for grommet. NOTE Check measurement with front grommet to make sure the hole will clear tub walls and grommet flange clears tub wall radius. Front grommet reference dimensions assume a straight-edge used for measurement. If installing speaker pod kit, make sure there is enough clearance for the speaker bracket. | |||||
| 7. | Center punch location to be drilled. | |||||
| 8. | To protect painted surface, install masking tape over marked pilot hole location. | |||||
| 9. | Drill 1/8-in pilot hole for front grommet. | |||||
| 10. | Drill one 3/4-in hole for front grommet. | |||||
| 11. | Remove masking tape. | |||||
| 12. | Deburr hole. |
| 1 | 6.61-in (168mm) |
| 2 | 5.78-in (147mm) |
| 3 | 3.14-in (80mm) |
| 1. | See Figure 7. Install and route Tour-Pak tub (1) wire harness (3). a. Place wire harness (3) in tub. b. See Figure 9. Feed wire harness pins (2) through front hole. c. See Figure 7. Feed light connector (4) through back hole. d. Install front and back grommets (2, 5). |
Figure 7. Wire Harness
Figure 8. Wire Harness Routing | ||||||||||||||||
| 2. | See Figure 9. Install light assembly (5) to Tour-Pak. a. See Figure 10. Connect harness (2) to light. b. See Figure 9. Set light (5) onto Tour-Pak tub (3). c. Install five screws (4). Torque: 3.8–4.5 N·m (34–40 in-lbs) NOTE Tape is used to control harness path prior to securing Tour-Pak mounting plate. d. See Figure 8. Secure harness with tape (7) (customer provided). NOTE Prep tub surface by removing grease, oil, and debris. Clean with a 50:50 mixture of isopropyl alcohol and water. Allow part to completely dry. e. Install self adhesive anchors (8) to Tour-Pak tub. f. Secure wire harness to anchors with cable straps (8). |
Figure 9. Install Light Assembly
Figure 10. Wire Harness Connector | ||||||||||||||||
| 3. | See Figure 9. Pin wire terminals (2) from harness to 6-pin connector (1). a. Refer to Table 2. Fill empty cavities with seal plugs (11). b. See cavity assignment in Table 3. | |||||||||||||||||
| 4. | See Figure 11. With secondary lock unlocked, align the terminal to rear of connector. | |||||||||||||||||
| 5. | Insert terminal until it stops and locks on the lock finger with an audible click. | |||||||||||||||||
| 6. | Push down on secondary lock inside connector shell to lock terminals. |
Figure 11. MX Series Terminal Installation | ||||||||||||||||
| 7. | Install mounting plate before panel. Reuse two screws removed previously. Tighten. Torque: 3.4–4.7 N·m (30–42 in-lbs) |
Cavity Number | Wire Color | Signal |
|---|---|---|
1 | - | Plug |
2 | - | Plug |
3 | Blue | Run/Position |
4 | Blue Red | Brake Light |
5 | - | Plug |
6 | Black | Ground |
| 1. | See Figure 12. Install filler panel (2) to Tour-Pak tub (1). a. Install 4 clips (4) to panel. b. Align filler panel (2) against and Tour-Pak tub (1). NOTE Make sure upper left and right sections of the filler panel are seated before securing it. c. Install four screws (3). Tighten. Torque: 3.8–4.5 N·m (34–40 in-lbs) |
| 1 | Tour-Pak tub |
| 2 | Filler panel |
| 3 | Screw (4) |
| 4 | Clip (4) |
| 1. | Install Adaptor Harness. a. Disconnect connector C7. b. Connect 12pin (2023-2025) or 16pin (2026-later) adaptor harness inline with male and female C7. NOTE Make sure 4-way audio connectors on adapter harness are connected together in the same configuration if an adapter is already present. If adding the adapter, connect the 4-way pin and socket sides of the adapter together c. See Figure 13. Bundle C7 connectors at rear fender and make sure clearance to seat pan is maintained. |
Figure 13. Cable Strap Locations | ||||||
| 2. | See Figure 2. Install lower tether anchor. a. Install Tour-Pak tub liner (4). b. Install lower tether anchor (2) to Tour-Pak tub (3). c. Install two screws (1). Tighten. Torque: 2.6–3.2 N·m (23–28 in-lbs) d. Close Tour-Pak top and test tether operation. | |||||||
| 3. | Install rack to Tour-Pak. a. See rack documentation for torque specification. b. Install docking hardware. See docking hardware documentation for torque specification. | |||||||
| 4. | Install Tour-Pak. | |||||||
| 5. | Connect Tour-Pak harness to adapter harness. | |||||||
| 6. | See Figure 13 and Figure 14. Make sure excess harness avoids moving components. a. Route light harness along frame rail and secure harness adaptor with cable strap. b. Make sure clearance to seat pan is maintained. |
Figure 14. Excess Harness | ||||||
| 7. | Secure light harness to frame rail with re-closable (2) cable strap. a. Do not clip cable strap. b. Ensure seat does not pinch light harness. |
| 1. | Install main fuse. See service manual. | |
| 2. | Update BCM software 16.5.11.2 or later. | |
| 3. | Install left side cover. See service manual. | |
| 4. | Install left saddlebag. See service manual. | |
| 5. | Install seat. |