1 | Perpendicular line |
2 | Vertical line |
3 | 7.6 m (25 ft) |
4 | High beam bulb centerline |
5 | Horizontal line 53.3 mm (2.1 in) lower than bulb centerline |
1. | XG500, XG750: Remove speed screen. a. See Figure 2. Remove speed screen screws (1) and washers (2). b. Pull speed screen away from upper speed screen bracket (4). c. Pull speed screen away from lower speed screen bracket (5). | |
2. | XG750A: Remove speed screen. a. See Figure 3. Pull speed screen (2) away from speed screen bracket (1). | |
3. | See Figure 4. Loosen horizontal adjustment locknut (1). | |
4. | Direct light beam straight ahead. | |
5. | Tighten horizontal adjustment locknut. Torque: 27.5–32.5 N·m (20–24 ft-lbs) Headlamp horizontal locknut NOTE Perform all adjustments before installing speed screen. | |
6. | See Figure 3. Align posts of speed screen (3) with grommets. | |
7. | XG500, XG750: Install speed screen. a. Install speed screen onto lower speed screen bracket (5). b. Align speed screen to upper speed screen bracket (4). c. Install washers (2) and screws (1). Torque: 2.3–3.3 N·m (20–29 in-lbs) Speed screen screw | |
8. | XG750A: Install speed screen. a. See Figure 3. Align speed screen post to grommets and push. |
1. | See Figure 4. Loosen locknut (1) for vertical adjustment bolt (2) | |
2. | Aim headlamp at horizontal line on wall. | |
3. | Tighten vertical adjustment locknut. Torque: 20.6–25.5 N·m (15–19 ft-lbs) Headlamp vertical adjustment locknut |
1 | Screw (2) |
2 | Washer (2) |
3 | Speed screen |
4 | Upper speed screen bracket |
5 | Lower speed screen bracket |
6 | Post (2) |
1 | Fairing support bracket |
2 | Speed screen |
1 | Vertical adjustment locknut |
2 | Vertical adjustment bolt |
3 | Horizontal adjustment locknut |
1. | XG500, XG750: Remove speed screen. a. See Figure 2. Remove speed screen screws (1) and washers (2). b. Pull speed screen away from upper speed screen bracket (4). c. Pull speed screen away from lower speed screen bracket (5). | |
2. | XG750A: Remove speed screen. a. See Figure 3. Pull speed screen (2) away from speed screen bracket (1). | |
3. | Remove main fuse. See Service Procedures → Fuses and Relays. | |
4. | See Figure 5. Remove screws (6). | |
5. | Pull lens assembly (5) from headlamp housing. | |
6. | Disconnect electrical connectors from headlamp and position bulbs. | |
7. | Loosen screw (2). | |
8. | Remove retainer (3). | |
9. | Remove headlamp bulb (4). | |
10. | Remove position bulb (7). | |
11. | Install new headlamp or position bulb. | |
12. | Install retainer (3). | |
13. | Tighten screw (2). | |
14. | Connect electrical connectors to headlamp and position bulbs. | |
15. | Attach lens assembly (5) to headlamp housing. | |
16. | Install screws (6). | |
17. | XG500, XG750: Install speed screen. a. Install speed screen onto lower speed screen bracket (5). b. Align speed screen to upper speed screen bracket (4). c. Install washers (2) and screws (1). . Torque: 2.3–3.3 N·m (20–29 in-lbs) Speed screen screw | |
18. | XG750A: Install speed screen. a. Align speed screen post to grommets and push. | |
19. | Install main fuse. See Service Procedures → Fuses and Relays. | |
WARNING Be sure that all lights and switches operate properly before operating motorcycle. Low visibility of rider can result in death or serious injury. (00316a) | ||
20. | Check operation of all lamps. |
1 | Boot |
2 | Screw |
3 | Retainer |
4 | Headlamp bulb |
5 | Lens assembly |
6 | Screw (2) |
7 | Position bulb |