1. Position JSS.
a. Route sensor end of JSS between Rechargeable Energy Storage System (RESS) and frame.
2. See Figure 1. Connect JSS connector (2).
3. Install JSS connector retainer (1) to RESS.
4. Position sensor, install screw (5). Tighten.
Torque: 2.2–2.8 N·m (19–25 in-lbs) JSS screw
5. Install JSS wire into high voltage cover wire retainer (3).
1Connector retainer
2Jiffy Stand Sensor (JSS) connector
3High voltage cover wire retainer
4JSS connector
5screw
6High voltage cover
Figure 1. JSS (Frame Removed for Clarity)