1. See Figure 3. Route power receptacle (5).
2. Install motor caddy (4).
3. Install new cable straps (3).
4. Install p-clips (7) and screws (6). Tighten.
Torque: 5–7 N·m (44–62 in-lbs) P-clip to motor caddy screws
5. Install p-clips (2) and screws (1). Tighten.
Torque: 5–7 N·m (44–62 in-lbs) P-clip to motor screws
6. See Figure 2. Install new hose clip (2) and cable strap (3). Note location on coolant tube (1) and tape on cable (4).
7. See Figure 1. Position ground cable (4) and screw (3). Tighten.
Torque: 5–7 N·m (44–62 in-lbs) Ground screw
8. Install power receptacle (1) and screws (2). Tighten.
Torque: 5–7 N·m (44–62 in-lbs) Power receptacle screws
1Power receptacle
2Screws (3)
3Screw
4Ground terminal
Figure 1. Power Receptacle
1Hose
2Hose clip
3Cable strap
4Cable
Figure 2. Hose to Cable, Cable Strap
1Screws (2)
2P-clips (2)
3Cable straps (4)
4Engine caddy
5Power receptacle
6Screws (4)
7P-clips (2)
Figure 3. Motor Caddy and Harness