| 1. | Place new harness in position (4). | |
| 2. | See Figure 4. a. Position wires (6) install screws (7). Tighten. Torque: 5–7 N·m (44–62 in-lbs) Rear GND screws b. Connect IMU connector (8). c. Connect rear WSS connector (5). d. Connect EHCU connector (9). e. Connect brake switch connectors (3). f. Position wires (2) and install ground screws (1). Tighten. Torque: 5–7 N·m (44–62 in-lbs) Current sensor screws g. Install new cable strap (10). | |
| 3. | See Figure 3. Install left portion of main wire harness. a. Connect cooling fan connector (4). b. Connect TCU connector (3). c. Connect front WSS connector (2). d. Install strap (1). | |
| 4. | See Figure 2. Install upper right portion of main wire harness. a. Position P-clip, install screw (8). Tighten. Torque: 5–7 N·m (44–62 in-lbs) P-clip screw b. Connect front harness connector (6), install on lock. c. Connect TGS connector (5). d. Connect front fork lock connector (4). e. Connect LV power connector (3). f. Connect LV signal connector (2). g. Connect USB-C aux power charge port connector (1). h. Install anchored cable straps (9). | |
| 5. | See Figure 1. Install right portion of main wire harness. a. Position p-clamps (3) and install screws (1). Tighten. Torque: 5–7 N·m (44–62 in-lbs) P-clip screw b. Install new cable straps (2). c. Connect JSS connector (4). d. Connect coolant pump connector (5). |
| 1 | Screws (4) |
| 2 | Cable straps (6) |
| 3 | P-Clips (2) |
| 4 | JSS connector |
| 5 | Coolant pump connector |
| 1 | USB-C auxiliary power charge port |
| 2 | LV signal |
| 3 | LV power |
| 4 | Fork lock |
| 5 | TGS |
| 6 | Front harness |
| 7 | P-clip |
| 8 | Screw |
| 9 | Cable straps (8) |
| 1 | Cable strap |
| 2 | ABS connector |
| 3 | TCU connector |
| 4 | Cooling fan connector |
| 1 | Screws (2) |
| 2 | GND wires (3) |
| 3 | Brake switch connectors (2) |
| 4 | Main harness |
| 5 | Rear WSS connector |
| 6 | GND wires (2) |
| 7 | Screws (2) |
| 8 | IMU connector |
| 9 | EHCU connector |
| 10 | Cable strap |