1. Place new harness in position (4).
2. See Figure 4.
a. Position wires (6) install screws (7). Tighten.
Torque: 5–7 N·m (44–62 in-lbs) Rear GND screws
b. Connect IMU connector (8).
c. Connect rear WSS connector (5).
d. Connect EHCU connector (9).
e. Connect brake switch connectors (3).
f. Position wires (2) and install ground screws (1). Tighten.
Torque: 5–7 N·m (44–62 in-lbs) Current sensor screws
g. Install new cable strap (10).
3. See Figure 3. Install left portion of main wire harness.
a. Connect cooling fan connector (4).
b. Connect TCU connector (3).
c. Connect front WSS connector (2).
d. Install strap (1).
4. See Figure 2. Install upper right portion of main wire harness.
a. Position P-clip, install screw (8). Tighten.
Torque: 5–7 N·m (44–62 in-lbs) P-clip screw
b. Connect front harness connector (6), install on lock.
c. Connect TGS connector (5).
d. Connect front fork lock connector (4).
e. Connect LV power connector (3).
f. Connect LV signal connector (2).
g. Connect USB-C aux power charge port connector (1).
h. Install anchored cable straps (9).
5. See Figure 1. Install right portion of main wire harness.
a. Position p-clamps (3) and install screws (1). Tighten.
Torque: 5–7 N·m (44–62 in-lbs) P-clip screw
b. Install new cable straps (2).
c. Connect JSS connector (4).
d. Connect coolant pump connector (5).
1Screws (4)
2Cable straps (6)
3P-Clips (2)
4JSS connector
5Coolant pump connector
Figure 1. Main Wire Harness (right)
1USB-C auxiliary power charge port
2LV signal
3LV power
4Fork lock
5TGS
6Front harness
7P-clip
8Screw
9Cable straps (8)
Figure 2. Main Wire Harness (Upper Right)
1Cable strap
2ABS connector
3TCU connector
4Cooling fan connector
Figure 3. Main Wire Harness (left)
1Screws (2)
2GND wires (3)
3Brake switch connectors (2)
4Main harness
5Rear WSS connector
6GND wires (2)
7Screws (2)
8IMU connector
9EHCU connector
10Cable strap
Figure 4. Main Wire Harness (right)