Prepare
1. Remove top cover. See Chassis → TOP COVER.
2. Deactivate electrical system. See Electrical → POWER DISCONNECT.
3. Remove front cover. See Electric Vehicle Powertrain (EVPT) → FRONT COVER.
4. Drain coolant. See Cooling System → COOLANT.
Remove
1. See Figure 1. Reposition clamps (1).
2. Remove hose (2).
Install
1. See Figure 1. Install hose (2).
2.
NOTE
At inlet pipe fitting, rotate hose clamp prongs downward and toward EVPT.
Reposition clamps (1).
1Clamp (2)
2Hose
Figure 1. Hose, Coolant Pump to EVPT
Inlet Coolant Fitting
Remove
NOTE
Do not replace fitting unless necessary.
1. See Figure 2. Remove screw (2).
2. Remove fitting (1).
Install
1. See Figure 2. Install fitting (1).
2. Install screws (2). Tighten.
Torque: 4.4–5.2 N·m (39–46 in-lbs) Coolant fitting screw, powertrain inlet
1Coolant Fitting
2Screw
Figure 2. Coolant Fitting, Pump to EVPT
Complete
1. Fill coolant. See Cooling System → COOLANT.
2. Install front cover. See Electric Vehicle Powertrain (EVPT) → FRONT COVER.
3. Activate electrical system. See Electrical → POWER DISCONNECT.
4. Install top cover. See Chassis → TOP COVER.